Commit Graph

1 Commits

Author SHA1 Message Date
Jeff Emmett 9b0bd7fde7 Initial commit: The Living Pipeline — B-Prize 2026 entry
Biomimicry-inspired distributed water system design for the
Collingwood-Alliston corridor as alternative to $270M centralized
WTP expansion. Includes research, A3 poster content, Scribus
generation script, HTML mockup, and project plan.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-31 07:18:33 +00:00